Completed Projects

Saudi Arabia 140m
Walkway

Oil Sand Dredging
Canada

Diamond Mine
Botswana

Oil Clean Up Project
Peruvian Amazon

Uranium Mine Northern
Canada

Previous Projects, Case History

With the complexities in handling heavy Uranium Tailings, with the assistance of Paterson & Cooke consulting engineers, the pivot walkway is being used to  deposit the tailing in an arc pattern along the length of the walkway. This ensures the tailings ia deposited evenly over the area of the tailings pond.

With additional walkway sections installed as required, to date the client has acquired over 102m of flexible walkways located at different points around the pond. Delivered Fully Assembled via truck from and transshipped to local carriers for Ice Road journey through the territories.

Download PDF of this project


Media

Request the XROSSWATER catalog by filling out the contact form.

Download Xrosswater PDF, Catalogue

Our PDF Catalogue available in many Language

Events, Media

Checkout Our Events, Media, Completed Projects

Xrosswater Information Video

Xrosswater Assembly Video

Xrosswater Floating Walkway

Xrosswater Pivot Folding Heavy Lift Walkway

Scan QR Code

Events

AACC

23 Oct 2019
AACC Forum Town Hall
Vienna
Website

17-20 Nov 2019
Tailings and Mine Waste 2019,
Vancouver
Website

15-18 Nov 2020
Tailings and Mine Waste 2020,
Colorado
Website

SAIMM logo

Nov 2021
The Southern African Institute of Mining and Metallurgy
Website

June 14-16, 2022
Mine Water SOlutions 2022,
Vancouver
Website

November 6-9, 2022
Tailings and Mine Waste 2022, Denver, Colorado USA
Website